INDOT scheduling more bridge work for eastern Indiana roadways

This is an archived article and the information in the article may be outdated. Please look at the time stamp on the story to see when it was last updated.

WAYNE COUNTY. Ind. — In an area of the state that is already scheduled for major bridge work along I-70 in Wayne County, INDOT officials have also announced that a nearby road that funnels traffic to and away from I-70 will also have a couple of bridges under construction starting in mid-May.

Contractors plan to close State Road 38 for up to 90 days starting on or after May 15 for construction on two bridges. The work will include replacing the bridge over Nolands Fork and rehabilitating the bridge over Long Creek. The bridges are less than 300 feet apart and located about a mile and a half between U.S. Highway 35 and Centerville Road.

During the road closure, detour signs will direct highway traffic south to Interstate 70 via State Road 1 and U.S. 35. All work on the project is expected to be complete before December.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s